Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0080

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0080","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CANTINGAS, SAN FERNANDO, ROMBLON","GAA 2025 SSP","On-Going",145546293.32,0,92.94,"Romblon DEO","MIMAROPA Region","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2025-05-23",null,2025,"Regular Infra - GAA 2025 SSP",12.31978,122.57216,"1705913000","1705900000"]
SHA-256
1fe53190d1630b9b6146cc45c1c4bf269784a06fff585ce93288553cd7bf4993

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.