Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0083

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0083","CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), ROMBLON STATE UNIVERSITY (RSU), BARANGAY LIWANAG, ODIONGAN, ROMBLON","GAA 2025 SSP","On-Going",9751581.36,0,100,"Romblon DEO","MIMAROPA Region","EMQ DESIGN & CONSTRUCTION (16128)","2025-03-24",null,2025,"Regular Infra - GAA 2025 SSP",12.39701,121.98362,"1705909000","1705900000"]
SHA-256
56acaeaefdbb68d4a9d29a2a8fbe47453b087c505bf93a057832cbabf8d066b1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.