Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0102

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0102","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SILUM, MAGDIWANG, ROMBLON","GAA 2025 SSP","On-Going",93122934.06,0,79.53,"Romblon DEO","MIMAROPA Region","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2025-07-10",null,2025,"Regular Infra - GAA 2025 SSP",12.48873,122.59683,"1705908000","1705900000"]
SHA-256
39cc5f25ef43ad6cccab64cd06f4f5dd1a071af0ee44062aabb41bbff0f1be67

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.