Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25FC0065

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25FC0065","CONSTRUCTION OF WATER SYSTEM IN BARANGAY EXCIBAN, LABO, CAMARINES NORTE","GAA 2025 SSP","Completed",4827781.99,0,100,"Camarines Norte DEO","Region V","GREAT WALL ENGINEERING (34573)","2025-06-23","2026-01-13",2025,"Regular Infra - GAA 2025 SSP",14.1927,122.65703,"501606000","501600000"]
SHA-256
571035d34b2b688d4b258204f94f0c00b5825cfe8f0810c70e79fdc319ebc19f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.