Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25FE0014

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25FE0014","OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BICOL RIVER (DOWNSTREAM), BARANGAY BALIUAG NUEVO, MINALABAC, CAMA","Flood Control and Drainage","On-Going",62096740,0,100,"Camarines Sur 2nd DEO","Region V","BICOL GOLDROCK CONSTRUCTION CORPORATION (32376)","2025-03-07",null,2025,"Regular Infra - GAA 2025 OO-2",13.52832,123.20215,"501722000","501700000"]
SHA-256
ee6c178b8e42891e7cab08a4928a8a51aef9c03672d78c4e6acd2a1e7d90cbaa

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.