Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25FN0037

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25FN0037","OO2:PROTECTLIVESANDPROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE UPSTREAM OF MAMPUAG BRIDGE,BRGY. SANTIAGO YOUNG,NABUA,CAM.SUR","GAA 2025 OO-2","On-Going",96500000,0,88,"Camarines Sur 5th DEO","Region V","G.C.I.  CONSTRUCTION AND DEV'T. CORP. (11346)","2025-06-23",null,2025,"Regular Infra - GAA 2025 OO-2",13.40108,123.36396,"501723000","501700000"]
SHA-256
11763e0aa0b42d82255d92e9dc76d80a480ba11e5b587ebc6dcd2fa2db747bd4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.