Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25G00008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25G00008","CONSTRUCTION OF MAGUGBA BRIDGE, BARANGAY POBLACION, LIBACAO, AKLAN","GAA 2025 SSP","On-Going",192589079.99,0,42.47,"Region VI","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2025-02-14",null,2025,"Regular Infra - GAA 2025 SSP",11.4787,122.29892,"600409000","600400000"]
SHA-256
734d9ee248849de4ac5c1b571544b9c38dd6e5baab613a6e5a6042acb5ca3e0b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.