Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25G00083

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25G00083","ROXAS CITY CIRCUMFERENTIAL ROAD, C3 SECTION, CAPIZ","GAA 2025 OO-1","On-Going",43149578,0,45.57,"Region VI","Region VI","ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION) (8546)","2025-05-21",null,2025,"Regular Infra - GAA 2025 OO-1",11.56038,122.77613,"601914000","601900000"]
SHA-256
4d0a900dad6484b44a3299b994cedc29a32f58a531654aaab7ed47cbda3e187a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.