Hashed input (canonical JSON of the source row)
["dpwh","25GG0202","CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG ULIAN RIVER IN DUEÑAS, ILOILO (PACKAGE B)","GAA 2025 SSP","Completed",123649498.4,0,100,"Iloilo 2nd DEO","Region VI","EARLY RISER CONSTRUCTION (33960)","2025-06-20","2026-07-27",2025,"Regular Infra - GAA 2025 SSP",11.05262,122.6192,"603017000","603000000"]
SHA-256
b9356edd5b7f06bc499149f83e746145cf63f5ceb9578d844e51a1dd237467d3