Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25GK0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25GK0041","CONSTRUCTION OF BREAKWATER, BARANGAY CHAMBERY, MANAPLA, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",4751997.31,0,100,"Negros Occidental 1st DEO","Negros Island Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2025-04-08","2025-06-28",2025,"Regular Infra - GAA 2025 SSP",10.98089,123.16584,"1804518000","1804500000"]
SHA-256
6dff98f6b0bfcd234a73eea9773df346c5c4f638eba17a42b64c4b531ace8ff4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.