Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25GN0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25GN0040","CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM, BARANGAY TABAO-RIZAL, SAN ENRIQUE, NEGROS OCCIDENTAL","Water Provision and Storage","On-Going",4888119.43,0,100,"Negros Occidental 4th DEO","Negros Island Region","JAIME B. CHING ENTERPRISES (4256)","2025-03-31",null,2025,"Regular Infra - GAA 2025 SSP",10.42698,122.8506,"1804525000","1804500000"]
SHA-256
c3576456f59fff71e4b58b4bbb79936bda6538173511851486a0b5b87957b8fb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.