Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25H00017

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25H00017","OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF MANCILANG-MALBAGO SEAWALL, PHASE 2, BARANGAY MALBAGO, MADRIDEJOS, CEBU","GAA 2025 OO-2","On-Going",145061752.5,0,91.9,"Region VII","Region VII","ROVILLA CONSTRUCTION (19514) / WTG CONSTRUCTION & DEVELOPMENT CORPORATION (7494)","2025-04-11",null,2025,"Regular Infra - GAA 2025 OO-2",11.28918,123.74629,"702228000","702200000"]
SHA-256
6d95019092f6ed1e85d6684b479665ce915f0aee82b5c40d4e009c17231fc1c1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.