Project 25HD0120
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25HD0120","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF ABUNO RIVER FLOOD CONTROL STRUCTURE, CITY OF NAGA, CEBU","Flood Control and Drainage","On-Going",48760434.29,0,90.62,"Cebu 1st DEO","Region VII","LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)","2025-03-26",null,2025,"Regular Infra - GAA 2025 OO-2",10.26269,123.75803,"702232000","702200000"]
SHA-256
e34b41996e44f26f59aea83c8d17a40c60b96f4476a586031b11d28357e8bb53Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.