Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25HJ0165

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25HJ0165","CONSTRUCTION OF EIGHT (8) UNITS RAINWATER COLLECTOR SYSTEM (RWCS) AT NEGROS ORIENTAL 1ST DISTRICT","Water Provision and Storage","Completed",2600000,0,100,"Negros Oriental 1st DEO","Negros Island Region","MAI CONSTRUCTION & SUPPLY (30839)","2025-03-27","2025-07-09",2025,"Regular Infra - GAA 2025 LS Itemization",9.68351,123.13381,"1804615000","1804600000"]
SHA-256
69a947593b5aab4cca7d7ae15bb70febb1d50ae45c725417444a1604ad5cfc4c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.