Project 25HN0105
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25HN0105","OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY PANOYPOY, (PHASE II), CONSOLACION, CEBU","Flood Control and Drainage","On-Going",84399352.1,0,32.43,"Cebu 6th DEO","Region VII","WTG CONSTRUCTION & DEVELOPMENT CORPORATION (7494)","2025-04-08",null,2025,"Regular Infra - GAA 2025 OO-2",10.4143,123.93044,"702219000","702200000"]
SHA-256
44f4ebd4678aa9d07d11e144d86bdaa39a1ab10bce016d66b9b8f81c98cbd44fHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.