Project 25HO0097
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25HO0097","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE SYSTEM, PHASE 3, BARANGAY TUNGA, MOALBOAL, CEBU","Flood Control and Drainage","On-Going",14479500,0,9.34,"Cebu 7th DEO","Region VII","ADAMANT DEVELOPMENT CORPORATION (54359)","2025-03-27",null,2025,"Regular Infra - GAA 2025 OO-2",9.95734,123.39515,"702233000","702200000"]
SHA-256
c93a6709814008437608fb1367c868916a0340eefc57419d95eae4455cbcb653Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.