Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25I00029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25I00029","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION (COMPLETION) OF FLOOD CONTROL STRUCTURE ALONG MAHAYAHAY CREEK, TACLOBAN CITY","Flood Control and Drainage","On-Going",91427730.67,0,90.4,"Region VIII","Region VIII","EZJONES CONSTRUCTION INC. (34462) / JB KONSTRUKTURA COMPANY (43862)","2025-03-07",null,2025,"Regular Infra - GAA 2025 OO-2",11.19921,125.00436,"831600000","803700000"]
SHA-256
a4c9fd2139a207f51228d7532b0bffa34fa7f0d9ee9962903f0884d3045152cc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.