Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IB0123

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IB0123","CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY SAN GREGORIO, BORONGAN CITY, EASTERN SAMAR","GAA 2025 SSP","On-Going",4928338.56,0,96.46,"Eastern Samar DEO","Region VIII","TUBIGAN BUILDERS (33185)","2025-11-17",null,2025,"Regular Infra - GAA 2025 SSP",11.53891,125.44408,"802604000","802600000"]
SHA-256
2124f75db5b9f952a913cc08c98080a75bab526292f871d1af5862d8f6c48f44

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.