Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IB0159

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IB0159","CONSTRUCTION OF MULTI-PURPOSE BUILDING (HALL), BARANGAY C  BORONGAN CITY, EASTERN SAMAR","GAA 2025 SSP","On-Going",4941624.85,0,100,"Eastern Samar DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2025-11-17",null,2025,"Regular Infra - GAA 2025 SSP",11.61695,125.42526,"802604000","802600000"]
SHA-256
9d65ef931efd8364f7ff7ff655a3ed6a03e93c770aff5f6b2377be9cbd1ec884

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.