Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IB0164

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IB0164","CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BRGY. SAN RAFAEL ALONG TAFT RIVER, TAFT, EASTERN SAMAR","GAA 2025 OO-2","On-Going",48249837.87,0,89.75,"Eastern Samar DEO","Region VIII","B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) (9687)","2025-11-13",null,2025,"Regular Infra - GAA 2025 OO-2",11.82855,125.27674,"802623000","802600000"]
SHA-256
ad2e8b525bd30ed3410ac344d94b1fabfbd21f2c76e101cff7b9c27280cbcffc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.