Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IG0043

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IG0043","CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY ALTAVISTA, MATALOM, LEYTE","GAA 2025 SSP","Completed",1976000,0,100,"Leyte 5th DEO","Region VIII","GPK CONSTRUCTION AND SUPPLY (52590)","2025-03-27","2025-08-04",2025,"Regular Infra - GAA 2025 SSP",10.27391,124.82666,"803734000","803700000"]
SHA-256
83b968633e218424ae4087be2eb6a97112c29ace6b686cce3f65223380cce547

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.