Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IN0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IN0022","CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY TOPTOP ROAD,","GAA 2025 SSP","On-Going",4816570.91,0,100,"Southern Leyte 2nd DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2025-04-11",null,2025,"Regular Infra - GAA 2025 SSP",10.38646,125.19239,"806403000","806400000"]
SHA-256
c2b49855ac80375bac24d674f43a9f26cb248577ce40e9fe7af44045e173b5c1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.