Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25J00033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25J00033","CONSTRUCTION / REHABILITATION OF FLOOD  MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS  AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD  CONTROL STRUCTURE ALONG KABASALAN RIVER,  PHASE V, PACKAGE 3, BARANGAY F.L. PENA,  KABASALAN, ZAMBOANGA SIBUGAY","GAA 2025 OO-2","On-Going",141608151.4,0,73.31,"Region IX","Region IX","IRON PEAK DEVELOPMENT CORPORATION (FORMERLY: 2M CONSTRUCTION & ENTERPRISES) (33331)","2025-04-02",null,2025,"Regular Infra - GAA 2025 OO-2",7.81046,122.7663,"908306000","908300000"]
SHA-256
14b6f6821e4f8380056f88fa6bcf85fc8e473dcae6796b3d7569bcf8431c454b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.