Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25JA0036

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25JA0036","CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) BUNGUIAO NATIONAL HIGH SCHOOL, BRGY. BUNGUIAO, CALABASA ELEMENTARY SCHOOL, BRGY. CALABASA, CURUAN CENTRAL SCHOOL, BRGY. CURUAN, DON GRAGORIIO EVANGELISTA MEMORIAL SCHOOL, BRGY. STA. CATALINA, LUMBAYAO ELEM","GAA 2025 LS Itemization","On-Going",2412439.96,0,87.57,"Zamboanga City 2nd DEO","Region IX","ADZ ENGINEERING AND CONSTRUCTION (48371)","2025-08-28",null,2025,"Regular Infra - GAA 2025 LS Itemization",null,null,"931700000","907300000"]
SHA-256
898f7dad5b945f5eef30593a063a3caf116dc4a1a23731c5715c3635492fb1c1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.