Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25JC0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25JC0021","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF RIVER BANK PROTECTION WORKS/FLOOD PROTECTION WORKS, LAGAG SIP, SINDANGAN ZAMBOANGA DEL NORTE","GAA 2025 OO-2","On-Going",29000230.87,0,94.75,"Zamboanga del Norte 2nd DEO","Region IX","D' DREAMER DEVELOPMENT CORPORATION (38489)","2025-03-26",null,2025,"Regular Infra - GAA 2025 OO-2",8.27536,123.07144,"907215000","907200000"]
SHA-256
a5e343060414bc8e58f97a371d854e41c6684a6c6296d1261d799a3ee59d0454

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.