Project 25JC0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25JC0035","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INGIN RIVER (UPSTREAM) R/S, BARANGAY MARAS, SINDANGAN, ZAMBOANGA DEL NORTE.","GAA 2025 OO-2","On-Going",38200410.23,0,81.35,"Zamboanga del Norte 2nd DEO","Region IX","D' DREAMER DEVELOPMENT CORPORATION (38489)","2025-03-28",null,2025,"Regular Infra - GAA 2025 OO-2",8.1887,122.98219,"907218000","907200000"]