Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25JI0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25JI0010","CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) ALONG SIBUGUEY RIVER (UPSTREAM), BARANGAY CONCEPCION, ALICIA, ZAMBOANGA SIBUGAY","Flood Control and Drainage","On-Going",39170821.25,0,75.16,"Zamboanga Sibugay 1st DEO","Region IX","LAKEWOOD CONSTRUCTION COMPANY (5294)","2025-02-26",null,2025,"Regular Infra - GAA 2025 OO-2",7.56396,122.90786,"908301000","908300000"]
SHA-256
ac57c05d5eca1801354bc618378375102e9feda39ab9948e363a29d72be12e3d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.