Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25KG0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25KG0028","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TITUNOD BRIDGE II (B00956MN), PACKAGE 1, KOLAMBUGAN, LANAO DEL NORTE","GAA 2025 OO-2","On-Going",48457897.79,0,100,"Lanao del Norte 1st DEO","Region X","AL HUSSEIN CONSTRUCTION (18438)","2025-03-19",null,2025,"Regular Infra - GAA 2025 OO-2",8.09982,123.8766,"1003508000","1003500000"]
SHA-256
b6b2a22890a2f0d3b4ca6b36b751eae8f4f43de089c3393ceb4a6709c72a3841

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.