Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25LI0076

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25LI0076","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER (TIPNASAN CREEK JUNCTION), PHASE 1, POBLACION, MARAGUSAN, DAVAO DE ORO","GAA 2025 OO-2","On-Going",95045238.16,0,93.95,"Davao de Oro 2nd DEO","Region XI","GOLDEN BETA FABRICATION SOLUTIONS INC. (58296) / MAGAR CONSTRUCTION AND SUPPLY (39012)","2025-07-10",null,2025,"Regular Infra - GAA 2025 OO-2",7.29945,126.13826,"1108205000","1108200000"]
SHA-256
e751a5c3fd636f9e1788055d99f3313db52a774e76fde121db80d5473ee40359

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.