Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25LI0080

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25LI0080","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 1, BARANGAY OSMEÑA, COMPOSTELA, DAVAO DE ORO","GAA 2025 OO-2","On-Going",143302392.89,0,99.74,"Davao de Oro 2nd DEO","Region XI","ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400) / MINDALIFI CONSTRUCTION AND SUPPLY (43667)","2025-07-21",null,2025,"Regular Infra - GAA 2025 OO-2",7.64972,126.10219,"1108201000","1108200000"]
SHA-256
3c7326afcf327b9b1b4aadbb4fc9e9ac4a029d105f1ff91f8d29ec1d4ee39270

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.