Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25MB0026

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25MB0026","CONSTRUCTION OF MULTI-PUPRPOSE BUILDING (COVERED COURT), PUROK FAUSTINO JAVIER, BARANGAY POBLACION, POLOMOLOK, SOUTH COTABATO","Buildings and Facilities","Completed",4920151.54,0,100,"South Cotabato 1st DEO","Region XII","J.G. ORANZA CONSTRUCTION (33370)","2025-03-14","2025-06-26",2025,"Regular Infra - GAA 2025 SSP",6.2336,125.07631,"1206312000","1206300000"]
SHA-256
6f79da83acbcd25f0efd3dfa99492791543d5b891b09c2810a3c266e81b84747

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.