Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25MB0071

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25MB0071","CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY GYMNASIUM), BARANGAY OLYMPOG, GENERAL SANTOS CITY","Buildings and Facilities","Completed",4939984.76,0,100,"South Cotabato 1st DEO","Region XII","BAYTORR CONSTRUCTION AND DEVELOPMENT CORPORATION (44719)","2025-03-14","2025-06-26",2025,"Regular Infra - GAA 2025 SSP",6.22248,125.19298,"1230800000","1206300000"]
SHA-256
0cdb7e22cf9967e84543abf17de2b5988d689d1cb7add4516bc6149ca1b37573

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.