Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25MH0050

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25MH0050","CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYMNASIUM), BARANGAY DUKAY, ESPERANZA, SULTAN KUDARAT","Buildings and Facilities","Completed",1963811.83,0,100,"Sultan Kudarat 2nd DEO","Region XII","WOODRIDGE BUILDERS CONSTRUCTION & SUPPLIES, INC. (42829)","2025-02-17","2025-04-21",2025,"Regular Infra - GAA 2025 SSP",6.68184,124.55773,"1206503000","1206500000"]
SHA-256
aae382210160a13b11e2d478e9ea01338a5891cf294bc561b36ce9709990d87d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.