Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25NG0006

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25NG0006","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE /BARANGAY STA. CRUZ, PLACER, SURIGAO DEL NORTE","GAA 2025 SSP","Completed",144497038.56,0,100,"Surigao del Norte 2nd DEO","Region XIII","JMT CONSTRUCTION CORPORATION (FORMERLY: JMT CONSTRUCTION) (14186)","2025-02-26","2025-10-07",2025,"Regular Infra - GAA 2025 SSP",9.62926,125.56168,"1606717000","1606700000"]
SHA-256
5f6dd5d9d78b25f79a2369315bfd047de54b31ee25c4dc79d6e1e7e14384c08a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.