Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25NG0023

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25NG0023","CONSTRUCTION OF KINABUTAN FLOOD CONTROL STRUCTURE ALONG SURIGAO RIVER, SUIRGAO CITY, SURIGAO DEL NORTE","GAA 2025 OO-2","On-Going",28949994.14,0,84.88,"Surigao del Norte 2nd DEO","Region XIII","A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D (34028)","2025-04-15",null,2025,"Regular Infra - GAA 2025 OO-2",9.7888,125.47048,"1606724000","1606700000"]
SHA-256
ba21f3ac6408074a0031473a463d3ba043b2bceb6672f86aaeb5fb3b99895834

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.