Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25OA0006

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25OA0006","CONSTRUCTION OF RIVERWALL ALONG TANZA DIKE (PHASE 4), BARANGAY TANZA, NAVOTAS CITY","GAA 2025 SSP","Completed",49498384.05,0,100,"Malabon-Navotas DEO","National Capital Region","TWO DIMENSION CONSTRUCTION (39410)","2025-02-20","2025-06-20",2025,"Regular Infra - GAA 2025 SSP",14.68329,120.93276,"1380900000","1307500000"]
SHA-256
fb4a005d1dec66084dca240b4a00660fb8463656e84fe02a252c945a77fce258

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.