Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25OA0011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25OA0011","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 8, BARANGAY TAÑONG TO BARANGAY DAMPALIT, MALABON CITY","GAA 2025 SSP","Completed",44550000,0,100,"Malabon-Navotas DEO","National Capital Region","5 JEWEL'S CONSTRUCTION AND SUPPLY CORP. (48420)","2025-02-20","2025-08-26",2025,"Regular Infra - GAA 2025 SSP",14.6823,120.94306,"1380400000","1307500000"]
SHA-256
7e26f5a40dc0db929c6d0b331cd72b428450157b7c0d7d7ba3ec0524507cb3fc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.