Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25OA0073

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25OA0073","CONSTRUCTION (COMPLETION) OF BRIDGE, BRGY. NORTH BAY BLVD., SOUTH, NAVOTAS CITY","GAA 2025 SSP","Terminated",0,0,0,"Malabon-Navotas DEO","National Capital Region","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2025-04-02","2025-11-27",2025,"Regular Infra - GAA 2025 SSP",14.64583,120.95794,"1380900000","1307500000"]
SHA-256
505a89b2868d9e417b872e0db17ead1bfcc73ef333cb64919d33997016cbcf97

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.