Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25OB0338

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25OB0338","CONSTRUCTION OF MULTI-PURPOSE BUILDING, ALVIAR COMPOUND, STA. ANA, PATEROS, METRO MANILA","GAA 2025 SSP","Terminated",0,0,0,"Metro Manila 1st DEO","National Capital Region","ZYRE TRADING AND CONSTRUCTION (42364)","2025-03-19","2025-08-15",2025,"Regular Infra - GAA 2025 SSP",14.54572,121.07312,"1381701000","1307600000"]
SHA-256
007698f3aa6e2f4564f39592864c1e987770cf8fd6529805dc8b6986abd1d203

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.