Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25P00018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25P00018","CONSTRUCTION OF  FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, GANGAT SECTION, STA. 39+001 - STA. 40+076 (R/S), BARANGAY CALAFUG, CONNER, APAYAO","GAA 2025 OO-2","On-Going",95016104.77,0,88.8,"Cordillera Administrative Region","Cordillera Administrative Region","RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)","2025-06-02",null,2025,"Regular Infra - GAA 2025 OO-2",17.78566,121.32181,"1408102000","1408100000"]
SHA-256
c58cd8a7b8478381af4fbf50ad8f173582520289370626aa2d6e26e121528618

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.