Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25P00023

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25P00023","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTION,  STA. 34+414 - 35+489 (R.S.), BARANGAY RIPANG, CONNER, APAYAO","GAA 2025 OO-2","On-Going",95060496.52,0,100,"Cordillera Administrative Region","Cordillera Administrative Region","RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)","2025-04-10",null,2025,"Regular Infra - GAA 2025 OO-2",17.80694,121.31544,"1408102000","1408100000"]
SHA-256
cedee938d34c860594f61abad80e0ec6d4f22c910c6f9f9f68364cb860899377

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.