Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25PA0099

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25PA0099","CONSTRUCTION OF SOLAR WATER SUPPLY SYSTEM, BARANGAY TOON, LA PAZ, ABRA","GAA 2025 SSP","On-Going",9404411.81,0,100,"Abra DEO","Cordillera Administrative Region","AEROPLAST CONSTRUCTION (47668)","2025-12-11",null,2025,"Regular Infra - GAA 2025 SSP",17.64835,120.65628,"1400108000","1400100000"]
SHA-256
5d8534554bd28e1ff2274ed42b29887ce0b6ffef0ec2484cd10ec30c38a4825f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.