Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25RE0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25RE0005","CONSTRUCTION OF ROAD, BARANGAY MACASILAO TO BARANGAY CAMBAYUBO, CALATRAVA, NEGROS OCCIDENTAL","GAA 2025 SSP","Completed",9793174.23,0,100,"Negros Occidental 5th DEO","Negros Island Region","RKVT CONSTRUCTION (54400)","2025-06-03","2026-01-26",2025,"Regular Infra - GAA 2025 SSP",10.68062,123.41532,"1804505000","1804500000"]
SHA-256
1235c2fb32f8c33c18b9bcc140ac7b31cc139f590aa201efda0e69212b268e9c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.