Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 26AE0032

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","26AE0032","BASIC INFRASTRUCTURE PROGRAM (BIP)- CONSTRUCTION OF MULTI-PURPOSE BUILDING(COVERED COURT), BARANGAY AGDEPPA, BANGAR, LA UNION (16.893220°, 120.416357°) (RE-ADVERTISEMENT)","GAA 2026 SSP","On-Going",4850844.51,0,32.16,"La Union 1st DEO","Region I","QUE CONSTRUCTION (48327)","2026-07-23",null,2026,"Regular Infra - GAA 2026 SSP",null,null,null,"103300000"]
SHA-256
28c9d18d2d58ed54535712037abe09415bfdc8d5abec050fc6cd593aa3aeac83

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.