Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 26EI0143

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","26EI0143","CONSTRUCTION OF DPWH SOUTHERN MINDORO  DEO BUILDING 1, PHASE   III, BARANGAY SAN MARIANO, ROXAS, ORIENTAL MINDORO, 12.645,   121.4313889","GAA 2026 LFP","On-Going",7720911.19,0,2.9,"Southern Mindoro DEO","MIMAROPA Region","LEWIS GJANN CONSTRUCTION (54135)","2026-09-02",null,2026,"Regular Infra - GAA 2026 LFP",null,null,null,null]
SHA-256
32d58d827a65320c6f17f6ec525795faab5e13412e9c8d8a208c36d03b13d35e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.