Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 26ID0026

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","26ID0026","ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS, PALO-CARIGARA - ORMOC RD-K0963+000.00-K0963+226.00, K0964+003.00 -K0964+290.00","GAA 2026 OO-1","On-Going",26484086.1,0,5.7,"Leyte 2nd DEO","Region VIII","SOCOR CONSTRUCTION CORPORATION (8020)","2026-08-27",null,2026,"Regular Infra - GAA 2026 OO-1",11.29394,124.63855,"803714000","803700000"]
SHA-256
7c5497e32c2c1217ecca5f705193d92dbe9acfdec8b330b73d7ab7a0f4b298e0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.