Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 26RA0110

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","26RA0110","CONSTRUCTION OF ROAD (STA. 5+136 - STA. 6+636), BARANGAY ANDRES BONIFACIO, CADIZ CITY, NEGROS OCCIDENTAL","GAA 2026 SSP","On-Going",31208197.07,0,31.34,"Negros Occidental 1st DEO","Negros Island Region","R.A.G. CORONA CONSTRUCTION AND AGGREGATES SUPPLY (39473)","2026-06-23",null,2026,"Regular Infra - GAA 2026 SSP",null,null,null,"1804500000"]
SHA-256
de4d7b75ccf61b782ef0c1c00b5118842501e798440747bb4ac75c4e5b300200

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.