Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 26RB0062

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","26RB0062","CONSTRUCTION OF CONNECTING ROAD FROM BRGY NABALI-AN -CABANBASAN - LIBOCAO,HIMAMAYLAN, NEGROS OCCIDENTAL","GAA 2026 SSP","On-Going",18899208,0,11.81,"Negros Occidental 2nd DEO","Negros Island Region","H.L.J CONSTRUCTION & ENTERPRISES (18080)","2026-09-11",null,2026,"Regular Infra - GAA 2026 SSP",null,null,null,"1804500000"]
SHA-256
1abb73d80683a0b32227cf1e85a7ea239336b7b90c60966a51ba4dbd5861e29b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.