Infrastructure Projects
DPWH contracts 2016–2026 · DPWH contract list (transparency.dpwh.gov.ph) via BetterGov.ph
More than 267,292 contracts found (showing the first 10,000)
Total contract value ₱6.62T
| Contract ID | Start | Description | Status | Office | Contractor | Amount |
|---|---|---|---|---|---|---|
| 25OD0357 | 1 yr 4 mo ago | CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), PALMERA NOVA EAST, BARANGAY 177, CALOOCAN CITYGAA 2025 SSP | On-Going | Metro Manila 3rd DEO | MK ZACK BUILDERS CORP. | ₱2.9M |
| 25OD0358 | 1 yr 4 mo ago | CONSTRUCTION OF LEGISLATIVE BUILDING, BRGY. KARUHATAN, VALENZUELA CITY (PHASE II)Buildings and Facilities | On-Going | Metro Manila 3rd DEO | J. SIMEON CONSTRUCTION | ₱114.6M |
| 25OD0359 | 1 yr 4 mo ago | CONSTRUCTION OF ROAD INCLUDING DRAINAGE STRUCTURE CONNECTING M.B. ASISTIO STREET AND ROSE STREET, BARANGAY 187, CALOOCAN CITYGAA 2025 SSP | Completed | Metro Manila 3rd DEO | TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) | ₱5.6M |
| 25OD0377 | 1 yr 4 mo ago | RAINWATER COLLECTORS IN PUBLIC FACILITIES, CALOOCAN AND VALENZUELA CITYGAA 2025 LS Itemization | On-Going | Metro Manila 3rd DEO | TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) | ₱2.6M |
| 25OE0200 | 1 yr 4 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING, ZONE 1-12, TONDO, MANILAGAA 2025 SSP | Terminated | North Manila DEO | AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129) | ₱0 |
| 25P00025 | 1 yr 4 mo ago | CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA AND TUBLAY, POBLACION JCT.-BATUANG-CARANTES JCT-BALATOC JCT. (SECTION 6 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), BENGUETGAA 2025 OO-1 | On-Going | Cordillera Administrative Region | MG SAMIDAN CONSTRUCTION | ₱52.3M |
| 25PC0050 | 1 yr 4 mo ago | OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONS OF FLOOD CONTROL STRUCTURE, STA. FILOMENA, STA. 0+000 - STA. 0+800, CALANASAN, APAYAOGAA 2025 OO-2 | On-Going | Apayao 2nd DEO | ASC CONSTRUCTION & CONCRETE PRODUCTS | ₱59.1M |
| 25PC0054 | 1 yr 4 mo ago | OO1:ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM-REHAB/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD-K0617+420.50-K0618+078,K0621+ 009.50-K0621 + 028,K0621+073-K0621+177GAA 2025 OO-1 | On-Going | Apayao 2nd DEO | AQUILA CONSTRUCTION CO. | ₱18.7M |
| 25PC0055 | 1 yr 4 mo ago | OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - REHAB/ RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE, & LANDSLIDE-TERTIARY ROADS - APAYAO(CALANASAN)-ILOCOS NORTE RD-K0622+577-K0622+628, K0629+000 - K0629+045GAA 2025 OO-1 | On-Going | Apayao 2nd DEO | JPO BUILDERS AND CONSTRUCTION SUPPLY | ₱27.8M |
| 25C00018 | 1 yr 4 mo ago | ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACANRoads | On-Going | Region III | DRJY CONSTRUCTION | ₱26.4M |
| 25C00491 | 1 yr 4 mo ago | NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF BULACANRoads | On-Going | Region III | 729 CONSTRUCTION, INC. (FORMERLY 722 CONSTRUCTION, INC.) | ₱12.5M |
| 25C00492 | 1 yr 4 mo ago | ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJAGAA 2025 OO-1 | Completed | Region III | CELSO C. FERRER CONSTRUCTION CORP. | ₱37.3M |
| 25CP0043 | 1 yr 4 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BUGA-SALACOT CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL,BULACAN (UPSTREAM DIKE,PACKAGE 1)Flood Control and Drainage | On-Going | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | ₱47.5M |
| 25CP0052 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- SOLAR STREET LIGHTS INSTALLATION AND APPLICATION, SIBUL- BIAK NA BATO ROAD SECTION, SAN MIGUEL, BULACANRoads | On-Going | Bulacan 3rd DEO | ADSL CONSTRUCTION & TRADING | ₱95.1M |
| 25CP0054 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION / APPLICATION OF SOLAR LED LIGHTS ALONG F. VIOLA HIGHWAY (SEGMENT 1), SAN RAFAEL, BULACANGAA 2025 SSP | On-Going | Bulacan 3rd DEO | ONE FRAME CONSTRUCTION INC. (57070) / SKYLINE EDGE CONSTRUCTION CORP. | ₱95.1M |
| 25CP0127 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE A)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / ONE FRAME CONSTRUCTION INC. | ₱97.4M |
| 25CP0128 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE B)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / ONE FRAME CONSTRUCTION INC. | ₱97.5M |
| 25CP0130 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE D)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / ONE FRAME CONSTRUCTION INC. | ₱97.5M |
| 25CP0133 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF SIBUL - DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 2)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / ONE FRAME CONSTRUCTION INC. | ₱97.6M |
| 25CP0139 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRAT. PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BRGY LABNE, SAN MIGUEL, BULACAN,PACKAGE 11Flood Control and Drainage | On-Going | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | ₱97.5M |
| 25CP0145 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA.PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CONTROL STRUCTS,. SAN MIGUEL RIVER, BRGY. LABNE, SAN MIGUEL, BULACAN, (PACKAGE 13)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | ₱97.5M |
| 25CP0149 | 1 yr 4 mo ago | BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE SLOPE PROTECTION INCL. IMPROVEMENT OF WATERWAYS ALONG TARTARO SECTION, SAN MIGUEL, BULACAN (PHASE 6)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / ONE FRAME CONSTRUCTION INC. | ₱97.4M |
| 25CP0154 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. -BASIC INFRA. PROG. (BIP) - BIP -FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONSTRUCTION OF CONCRETE SLOPE PROTECTION INCL. IMPROVEMENT OF WATERWAYS ALONG TARTARO SECTION, SAN MIGUELGAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / ONE FRAME CONSTRUCTION INC. | ₱48.8M |
| 25CP0172 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP) - BIP - MULTI-PURPOSE BLDGS./ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING SAPANG PUTIK ELEMENTARY SCHOOL, BARANGAY SAPANG PUTIK, SAN ILDEFONSO, BULACANGAA 2025 SSP | On-Going | Bulacan 3rd DEO | EMICA BUILDERS AND SUPPLY | ₱43.9M |
| 25CP0174 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, PASONG BANGKAL ELEMENTARY SCHOOL, SAN RAFAEL, BULACANGAA 2025 SSP | On-Going | Bulacan 3rd DEO | 3AMR CONSTRUCTION SERVICES INC.(FORMERLY: 3AMR CONSTRUCTION SERVICES) | ₱19.5M |
Contract amounts as DPWH lists them, not payments. A contract alone does not establish irregularity.