JDRC CONSTRUCTION & SUPPLIES, CORP.
Contractor 3dd7c8a2eedbbe2ad7d1
Overview
PhilGEPS awards
₱3.37B · 51 awards
DPWH contracts
₱4.50B · 61 contracts
Rank by recorded value
#440 of 23,487
More info
First record
Apr 9, 2018 (8 yrs 7 mo ago)
Latest record
Aug 6, 2026 (3 mos ago)
DPWH contractor code
33869
Where they work
Sarangani₱2.92B
South Cotabato₱1.40B
Davao del Sur₱732.6M
Maguindanao del Norte₱626.8M
Maguindanao del Sur₱567.3M
Latest 25 from a total of 61 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25M00259 | 3 mos ago | CONSTRUCTION OF RIVERBANK PROTECTION ALONG MARBEL RIVER, BRGY. SARAVIA, KORONADAL CITYGAA 2025 OO-2 | On-Going | Region XII | ₱95.9M |
| 25M00128 | 4 mos ago | WIDENING OF PERMANENT BRIDGE - ALIP BR. (B02156MN) ALONG KIDAPAWAN-ALLAH JUNCTION RD, K1650+669.000 - K1650+729.000, DATU PAGLAS, MAGUINDANAO DEL SURGAA 2025 OO-1 | On-Going | Region XII | ₱60.0M |
| 25M00130 | 1 yr 3 mo ago | CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) ALONG ALIP RIVER (PHASE II), STA. 0+330 - STA. 0+557 (LEFT BANK); STA. 0+413 - STA. 0+513 (RIGHT BANK), DATU PAGLAS, MAGUINDANAOGAA 2025 OO-2 | On-Going | Region XII | ₱56.2M |
| 25M00131 | 1 yr 3 mo ago | CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) ALONG ALIP RIVER (PHASE III), STA. 0+000 - STA. 0+159 (LEFT BANK); STA. 0+000 - STA. 0+168 (RIGHT BANK), DATU PAGLAS, MAGUINDANAOGAA 2025 OO-2 | On-Going | Region XII | ₱56.2M |
| 25M00014 | 1 yr 4 mo ago | ROAD WIDENING - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) - K1627 + 417 - K1628+617, MALUNGON, SARANGANIGAA 2025 OO-1 | On-Going | Region XII | ₱46.4M |
| 25M00031 | 1 yr 5 mo ago | ROAD WIDENING - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) - K1641+277 - K1646 + 000, GENERAL SANTOS CITYGAA 2025 OO-1 | Completed | Region XII | ₱124.0M |
| 25M00038 | 1 yr 5 mo ago | ROAD WIDENING - MAHARLIKA HIGHWAY( DIGOS-MAKAR RD) - K1631 + 653 - K1634 + 200, GENERAL SANTOS CITYGAA 2025 OO-1 | Completed | Region XII | ₱72.1M |
| 25M00015 | 1 yr 8 mo ago | CONSTRUCTION OF MISSING LINKS/NEW ROADS - DEMOLOC -LITTLE BAGUIO-ALABEL RD, CHAINAGE 39832.5 - CHAINAGE 42021, ALABEL, SARANGANIGAA 2025 OO-1 | On-Going | Region XII | ₱136.6M |
| 25M00182 | 1 yr 8 mo ago | CONSTRUCTION OF CONCRETE REVETMENT, DOWNSTREAM OF UPPER SILWAY BRIDGE, SILWAY RIVER, STA 0+000 - STA 0+452, BARANGAY SAN ISIDRO, GENERAL SANTOS CITY, SOUTH COTABATOGAA 2025 OO-2 | Completed | Region XII | ₱93.6M |
| 25M00184 | 1 yr 8 mo ago | CONSTRUCTION OF CONCRETE REVETMENT, MAKAR RIVER, STA 0+000 - STA 0+400, GENERAL SANTOS CITY, SOUTH COTABATOGAA 2025 OO-2 | Completed | Region XII | ₱93.6M |
| 24M00155 | 1 yr 9 mo ago | 1. INSTALLATION OF ROAD SAFETY DEVICES / FACILITIES ALONG COTABATO-MARBEL RD - K1712 + 800 - K1713 + 800, BARANGAY PARAISO, KORONADAL, SOUTH COTABATO2. INSTALLATION/APPLICATION/CONSTRUCTION OF SIGNAGE, PAVEMENT MARKINGS, PAVED SHOULDERS AND STREET LRoads | Completed | Region XII | ₱27.6M |
| 24M00057 | 2 yrs 3 mo ago | ROAD WIDENING - COTABATO-LANAO RD - K1858+100 - K1858+263, K1858+263 - K1858+353, K1858+353 - K1860+558, SULTAN KUDARAT, MAGUINDANAO DEL NORTEFlood Control: Construction - Bank Protection Structure, Roads: Construction - PCCP, Traffic Engineering and Management System (including Road Safety Devices) | On-Going | Region XII | ₱143.3M |
| 24M00211 | 2 yrs 3 mo ago | PAVING OF UNPAVED ROADS - DEMOLOC-LITTLE BAGUIO-ALABEL RD (S00221MN) - K1695+146.50 - K1697+057.5, ALABEL, SARANGANIGAA 2024 OO-1 | Completed | Region XII | ₱140.9M |
| 24M00149 | 2 yrs 5 mo ago | ROAD WIDENING - DIGOS-MAKAR RD - K1635+383 - K1638+200, K1646+000 - K1648+363, GENERAL SANTOS CITYFlood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP, Traffic Engineering and Management System (including Road Safety Devices) | Completed | Region XII | ₱150.7M |
| 24LD0122 | 2 yrs 6 mo ago | CONSTRUCTION OF ROAD, BRGY. SAN MIGUEL- BRGY. IGPIT ROAD, DIGOS, DAVAO DEL SURGAA 2024 SSP | Completed | Davao del Sur DEO | ₱49.5M |
| 24M00007 | 2 yrs 6 mo ago | ROAD WIDENING - DIGOS-MAKAR RD - K1594 + 000 - K1597 + 800, K1600 + 167 - K1600+300, MALUNGON, SARANGANIFlood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP | Completed | Region XII | ₱164.0M |
| 24M00035 | 2 yrs 6 mo ago | CONSTRUCTION OF RIVERBANK PROTECTION/REVETMENT ALONG ESTEROS RIVER, (DOWNSTREAM) (ESTEROS BRIDGE APPROACH A-MALAGAPAS SECTION), STA. 0+665 - STA. 1+350, PHASE I, BRGY. ROSARY HEIGHTS 10, COTABATO CITYGAA 2024 OO-2 | On-Going | Region XII | ₱96.4M |
| 24M00163 | 2 yrs 6 mo ago | CONSTRUCTION OF CONCRETE REVETMENT, MAKAR RIVER, STA. 0+000 - STA. 0+530, BARANGAY FATIMA, GENERAL SANTOS CITYFlood Control and Drainage | Completed | Region XII | ₱120.6M |
| 24MB0002 | 2 yrs 7 mo ago | CONSTRUCTION OF CONCRETE REVETMENT, UPPER SILWAY BRIDGE, SILWAY RIVER, BARANGAY APOPONG, GENERAL SANTOS CITYFlood Control and Drainage | Completed | South Cotabato 1st DEO | ₱70.0M |
| 24ME0034 | 2 yrs 8 mo ago | CONSTRUCTION OF KIBLIS FLOOD CONTROL, KIAMBA, SARANGANI PROVINCEGAA 2024 OO-2 | Completed | Sarangani DEO | ₱48.2M |
| 23M00177 | 3 yrs 1 mo ago | CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) ALONG MATAMPAY RIVER, STA 0 + 000 - STA 0 + 243, BRGY. POBLACION 5, COTABATO CITYFlood Control and Drainage | Completed | Region XII | ₱48.3M |
| 23M00050 | 3 yrs 1 mo ago | CONSTRUCTION OF CONCRETE ROAD - MALALAG-KIAYAP-ZION-BATIAN ROAD LEADING TO ZION-BATIAN ECOSITES, STA. 10+460 - STA. 12+340, BRGY. BATI-AN, MAITUM, SARANGANIFlood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP, Traffic Engineering and Management System (including Road Safety Devices) | Completed | Region XII | ₱88.3M |
| 23M00171 | 3 yrs 2 mo ago | CONSTRUCTION OF POBLACION RIVER CONTROL, STA. 0+000 - STA. 0+756.994, KIAMBA, SARANGANIFlood Control and Drainage | Completed | Region XII | ₱101.3M |
| 23ME0070 | 3 yrs 3 mo ago | REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROAD ALONG SSKCR, K 1724+080-K1724+382, K1749+421-K1749+538, K1750+478.50-K1751+105.50, K1761+272.50-K1761+480, K1761+567.50-K1761+744.00, KIAMBA, SARANGANI PROVINCERoads | Completed | Sarangani DEO | ₱47.2M |
| 23ME0053 | 3 yrs 6 mo ago | CONST. OF FLOOD MITIGATING STRUCTURE, PAG-ASA, ALABEL, SARANGANI PROVINCEFlood Control and Drainage | Completed | Sarangani DEO | ₱77.2M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.